Login

Production

#SectionActivityMitigation PlanCurrent Status
1 Quality Lab Chemical reagents stored above eye level Reagents relocated to lower shelves; MSDS binder placed near the workstation. Closed
2 Raw Material Yard Stacked raw material bags leaning without support Stacking height limited; pallet racking introduced; forklift-only handling for tall stacks. Open
3 Packing & Dispatch Vehicle and forklift movement in loading area One-way traffic plan; speed limit 10 km/h; banksman to guide reversing vehicles. In Progress
4 Casting Bay Ladle movement crossing pedestrian path Segregated pedestrian walkway with guard rail; siren and blinker on crane movement. Closed
5 Blast Furnace Toxic gas (CO) leakage near stove area Fixed CO detectors with alarm; portable gas monitor for every entry; buddy system for gas area jobs. Open
6 Blast Furnace Molten metal splash during tapping Heat resistant PPE and face shield mandatory; keep tapping area free from water and moisture; only authorised persons near tap hole. In Progress

← Back to departments